Fast, Flexible Solution for Changing
Industry Needs • Fast start with ramp-up to full power in five minutes or less.
• Engineered to cost-effectively cycle multiple times per day to meet dispatch profiles.
• Lightweight modular configuration for easier transport, installation, and onsite maintenance.
• Optimized hot day performance with Sprint, a wet compression inlet treatment for power augmentation.
• Robust design with industry- leading reliability (>99.8 percent) and availability (>98.4 percent).
• Proven simple cycle and combined cycle performance for efficient operation in duties from peaking to baseload.
LM6000 PC/PG:
• 50 MW/minute ramping capability with emissions-compliant turndown as low as 25 percent.
• Proven SAC combustion provides fuel flexibility with water injection for emission control.
• High fuel flexibility with capability to burn naphtha, propane, coke oven gas, ethanol, and LNG.
LM6000 PF/PF+:
• Combined cycle efficiencies of up to 56 percent.
• 50 MW/minute ramping capability.
• Proven dual fuel DLE combustion with 15 ppm NOx on gas fuel capability.
ISO Base Rating (MW)
Gross Heat Rate (Btu/kWh, LHV) Gross Heat Rate (kJ/kWh, LHV) Gross Efficiency (%, LHV) Exhaust Temperature (°F) Exhaust Temperature (°C) Exhaust Energy (MM Btu/hr) Exhaust Energy (MM kJ/hr) GT Turndown Minimum Load (%) GT Ramp Rate (MW/min)
NOx (ppm) (@15% O2) CO (ppm) (@15% O2)
Wobbe Variation (%)
Startup Time (Hot, Minutes) SC Net Output (MW)
SC Net Heat Rate (Btu/kWh, LHV) SC Net Heat Rate (kJ/kWh, LHV) SC Net Efficiency (%, LHV) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (Hot, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (Hot, Minutes)
LM6000 PC LM6000 PG LM6000 PF LM6000 PF+ 52
59
8,444 8,909 40.4% 851 455 225 237
25% 50 25
89/150 +/-20% 5
50
8,619 9,093 39.6% 58.6
6,573 6,935 51.9% 19% 50 30
118
6,555 6,916 52.1% 19% 100 30
8,581 9,053 39.8% 897 480 258 273
25% 50 25
94/150 +/-20% 5
57
8,746 9,227 39.0% 72.8
6,535 6,895 52.2% 19% 50 30
146
6,516 6,874 52.4% 19% 100 30
50
8,109 8,555 42.1% 865 463 221 233
50% 50 25
25/70
+/-25% 5
49
8,281 8,737 41.2% 58.3
6,179 6,520 55.2% 37% 50 30
117
6,161 6,500 55.4% 19% 100 30
57
8,256 8,711 41.3% 914 490 255 269
50% 50 25
25/25
+/-25% 5
55
8,419 8,883 40.5% 69.8
6,105 6,441 55.9% 37% 50 30
140
6,085 6,420 56.1% 18% 100 30
If you need a unit that can be quickly installed, and you want to operate simple cycle to begin with, and then convert to combined cycle in a year or two, you can’t beat LM6000 technology.
2x CC Plant Performance
1x CC Plant Performance
Performance SC Plant
Gas Turbine Parameters
Gas Turbine Rating
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144