Lowest Life Cycle
Cost in its Class • Combustion and hot gas path inspection intervals have been extended to 32,000 hours, with parts lasting multiple cycles to increase availability.
• Mark VIe control system real-time, physics-based modeling increases overall performance, operability, and reliability.
• OpFlex AutoTune software improves DLN system capability, allowing operation on a wide range of natural gas compositions.
9F.04… Enhancing the 9F.03 with the Proven
7F Advanced Gas Path • 9F.04 technology is built on more than 140 F-class Advanced Gas Path (AGP) installations and over 500,000 operating hours.
• AGP uses improved materials and cooling/sealing technology to provide enhanced performance with reliable, cost-effective operation.
• Power augmentation options are available to meet peak generation requirements up to 300 MW.
Quick and Efficient Response When Needs
Change • Average start-up reliability is greater than 97 percent.
• Low cumulative NOx emissions meet annual tonnage limits even while
operating in cyclic duty.
• Fast start option provides flexibility to shorten time required to produce power.
SC Net Output (MW)
SC Net Heat Rate (Btu/kWh, LHV) SC Net Heat Rate (kJ/kWh, LHV) SC Net Efficiency (%, LHV) Exhaust Temperature (°F) Exhaust Temperature (°C) Exhaust Energy (MM Btu/hr) Exhaust Energy (MM kJ/hr)
GT Turndown Minimum Load (%) GT Ramp Rate (MW/min)
NOx (ppmvd) at baseload (@15% O2) CO (ppm) at Min. Turndown w/o Abatement
Wobbe Variation (%)
Startup Time (Conventional/Peaking, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (RR Hot, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (RR Hot, Minutes)
9F.03 265
9,020 9,517 37.8% 1,104 596
1,458 1,538 35% 22 15 24
+/-15% 23/20 405
5,840 6,162 58.4% 46% 22 30
815
5,810 6,130 58.7% 22% 44 39
9F.04 281
8,830 9,316 38.6% 1,127 608
1,498 1,581 35% 23 15 24
+/-15% 23/20 429
5,740 6,056 59.4% 45% 22 30
861
5,710 6,024 59.8% 22% 44 39
The 9F.03/.04 unit is the gas turbine of choice for growing grids due to its ability to provide fast and efficient power. Twenty six fast-track 9F.03 machines achieved commercial operation in 2015, increasing Algeria’s electrical capacity by 70 percent.
2x CC Plant Performance
1x CC Plant Performance
Gas Turbine Parameters
Performance SC Plant
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144