Customer Value with the Lowest Life Cycle
Cost in Its Class • Enhanced compressor and hot gas path cooling and sealing technologies improve performance and durability.
• Single crystal materials and directionally solidified blades provide extended maintenance intervals and lengthened component life.
• Low fuel pressure requirements reduce the need for an onsite fuel compressor.
• Industry-leading DLN 2.5+ combustion system lowers emissions across a wide range of natural gas and distillate fuel compositions.
• Superior fuel flexibility; GE is the only manufacturer to offer an F-class heavy duty gas turbine that burns Arabian Super Light crude oil and also offers 15 percent C2, +20/-10 percent modified Wobbe index, plus capability for up to 5 percent hydrogen and 25 percent ethane.
Ready to Respond
• 99 percent reliability provides five to six more days of operation per year than the industry average.
• 10-minute fast start capability helps increase revenue and dispatchability.
• 98.3 percent start reliability delivers the power you need during peak demand.
• 50 percent turndown enables wider operating ranges and the ability to respond quickly to changing demand.
• 30 MW per minute ramp rate achieved while maintaining 9 ppm NOx emissions.
Global Product
Support and Services • Dispatch-ready teams located around the globe respond to unplanned outages with expertise, equipment and onsite engineers to help reduce downtime and recover faster.
The 7F.04 gas turbine demonstrates our commitment to continued investment in our customers’ fleet of gas turbines. From the first 7F units introduced in 1986, we have increased output by 45 MW and efficiency by 5 percent while reducing emissions and providing greater operating flexibility.
SC Net Output (MW)
SC Net Heat Rate (Btu/kWh, LHV) SC Net Heat Rate (kJ/kWh, LHV) SC Net Efficiency (%, LHV) Exhaust Temperature (°F) Exhaust Temperature (°C) Exhaust Energy (MM Btu/hr) Exhaust Energy (MM kJ/hr)
GT Turndown Minimum Load (%) GT Ramp Rate (MW/min)
NOx (ppmvd) at baseload (@15% O2) CO (ppm) at Min. Turndown w/o Abatement
Wobbe Variation (%)
Startup Time (Conventional/Peaking, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (RR Hot, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (RR Hot, Minutes)
(5ppm NOx) 193
7F.04
8,860 9,348 38.5% 1,129 609
1,034 1,091 50% 30 5 9
+20%, -10% 21/11 — — — — — — — — — — — — — —
(9ppm NOx) 198
7F.04
8,840 9,327 38.6% 1,151 622
1,059 1,117 49% 30 9 9
+/-7.5% 21/11 302
5,760 6,077 59.2% 58.4% 30 28
609
5,710 6,024 59.8% 29.4% 60 28
2x CC Plant Performance
1x CC Plant Performance
Gas Turbine Parameters
Performance SC Plant
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144