Focused on Solving Fast


Power Challenges • On-demand power plants delivered in weeks, not months, and commissioned in as few as 11 days from parking the first trailer.


• Mounted on a mobile, two-trailer assembly that can be transported via land, sea, or air to remote locations.


• A complete turnkey solution.


• Scalable blocks of power that can be aggregated to meet any site-specific need.


• Full power achieved within 10 minutes or less.


• Fuel flexibility that allows operation on natural gas, distillate oil, or condensates.


• 50 percent lower emissions compared to diesel generators when operating on natural gas.


ISO Base Rating (MW)


Gross Heat Rate (Btu/kWh, LHV) Gross Heat Rate (kJ/kWh, LHV) Gross Efficiency (%, LHV) Exhaust Temperature (°F) Exhaust Temperature (°C) Exhaust Energy (MM Btu/hr) Exhaust Energy (MM kJ/hr)


GT Turndown Minimum Load (%) GT Ramp Rate (MW/min)


NOx (ppm) (@15% O2) CO (ppm) (@15% O2)


Wobbe Variation (%)


Startup Time (Hot, Minutes) SC Net Output (MW)


SC Net Heat Rate (Btu/kWh, LHV) SC Net Heat Rate (kJ/kWh, LHV) SC Net Efficiency (%, LHV) CC Net Output (MW)


CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)


Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)


Startup Time (Hot, Minutes) CC Net Output (MW)


CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)


Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)


Startup Time (Hot, Minutes)


TM2500 37.1


9,171 9,676 37.2% 950 510 185 195


50% 30 25


250/275 +/-20% 10


34.9


9,341 9,856 36.5% 49


6,730 7,100 50.7% 36% 30 30 98


6,708 7,077


50.9% 36% 60 30


We have heard the customer and we are now able to deliver a TM2500 solution with around 24 percent more hot day power and a 20 percent reduction in installation cycle.


2x CC Plant Performance


1x CC Plant Performance


Performance SC Plant


Gas Turbine Parameters


Gas Turbine Rating


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144