GE’s Most Powerful and Efficient F-Class
Gas Turbine • F-class firing temperatures provide extended operation between planned maintenance events at 32,000 hour intervals.
• Similar architecture enables future upgrades to 9HA performance as plant requirements grow over time.
• Significant flexibility allows for customization for the specific power and exhaust condition needs of each project.
• Modular systems ease installation and reduce onsite labor requirements by reducing field mechanical welds by 25 percent and reducing field installed valves by a factor of 10.
• Maintenance is streamlined with quick- removal turbine roof, field-replaceable blades, and 100 percent borescope inspection coverage for all blades.
• Simplified dual fuel system uses less water, eliminates recirculation, and utilizes enhanced liquid purge for improved reliability and dependability.
SC Net Output (MW)
SC Net Heat Rate (Btu/kWh, LHV) SC Net Heat Rate (kJ/kWh, LHV) SC Net Efficiency (%, LHV) Exhaust Temperature (°F) Exhaust Temperature (°C) Exhaust Energy (MM Btu/hr) Exhaust Energy (MM kJ/hr)
GT Turndown Minimum Load (%) GT Ramp Rate (MW/min)
NOx (ppmvd) at baseload (@15% O2) CO (ppm) at Min. Turndown w/o Abatement
Wobbe Variation (%)
Startup Time (Conventional/Peaking, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (RR Hot, Minutes) CC Net Output (MW)
CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%) Ramp Rate (MW/min)
Startup Time (RR Hot, Minutes)
9F.06 342
8,310 8,768 41.1% 1,144 618
1,768 1,767 38% 65 15 9
+/-15% 23/12 508
5,580 5,887 61.1% 49% 65
<30
1,020 5,560 5,866 61.4% 23% 130 <30
The 9F.06 gas turbine offers a way to bridge the F-class to H-class performance gap for specific customer needs in 50Hz applications. By applying all our previous F and H-class learnings and performance validation results, we can now offer our largest F-class gas turbine with over 61 percent combined cycle efficiency.
2x CC Plant Performance
1x CC Plant Performance
Gas Turbine Parameters
Performance SC Plant
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144