High performance, high reliability: GE’s patented tube bundle has a 50-year track record of outstanding performance and unrivaled reliability in both original installations and retrofits.
Highly efficient: The standardized tube bundles are scaled to meet the needs of any power plant, regardless of size. Each bundle contains between 1,600 to 7,000 tubes.
Reduced costs: Floor-mounted axial or lateral condensers simplify construction of the turbine foundation and shorten civil work and erection durations. They are delivered as fully tubed modules so that minimal welding is required on site.
Robust: Our condensers are built to handle turbine and steam generator overloads and variations in cooling water temperature. They are also resistant to impingement erosion and tube vibration.