Fast Power Applications When customers need power fast, whether to quickly expand domestic capacity in response to unanticipated rapid growth in electricity demand or emergent requirements due to natural disasters, GE has a range of offerings to meet the need.


Emergency/Mobile Power GE helps customers respond to emergency power situations, bring power to remote areas, and generate backup power to support maintenance, overhauls, or outages at power plants or for large-scale projects. The TM2500 trailer-mounted aeroderivative gas turbine unit can be swiftly transported by land, air, or sea, and can be commissioned in less than 11 days to provide up to 31 MW of reliable power. The mobility of the TM2500 allows customers the flexibility to reposition power at the point of use as demands change.


Quick Shipment/Construction Electricity demand is not always easy to predict, so when a customer suddenly needs to add significant generating capacity to their operation or grid, GE has the speed and scale to respond. As the largest provider of gas turbine power generation systems in the world, we often have the required gas turbine, steam turbine, and generator products in the manufacturing process to enable fast delivery and shorten the time to commissioning and achieving electrification goals. And with our modular packaging and power island offerings, installation times are significantly reduced as well, bringing power online quickly.


Bridging Power When the time required for a power plant configuration best suited for the required economics does not meet the customer’s commercial operation needs, we can offer bridging power to close that gap. With a combination of mobile TM2500 units to meet the short-term power needs and the right long-term plant offering, GE is able to provide the optimum combination to deliver the best overall plant economics. Think of it as the “loaner car” until your new power plant is online.


Egypt In record time, empty land became a power station, generating about 1000 MW to support Upper Egypt’s power needs—just in time to meet the rising seasonal electricity demand. GE helped power this transformation through a major contract with the Egyptian government for 46 turbines: 34 aeroderivative gas turbines and 12 heavy duty gas turbines that will help to generate more than 2.6 GW of electricity—equivalent to power more than 8.7 million homes. In December 2014, within hours of signing contracts with the government of Egypt, GE dispatched its advanced gas turbine technology to construction sites across the country. Currently, four of the 9E turbines are running on natural gas and the remaining eight 9E units have fired on both distillate oil as well as heavy fuel oil.


EXPO Power Systems S.A. When Greece’s EXPO Power Systems S.A. needed a solution to meet the summer peak power demands of the Rhodes, Greece electricity grid, the company purchased a TM2500+ gas turbine generator. The TM2500+ gas turbine-generator set was commissioned within 10 days of arrival, and was ready to provide a fast, permanent source of power generation, staving off blackouts and power failures on this Greek Isle. The TM2500+ turbine-generator set is capable of producing up to 30 MW of power and can achieve full power in less than 10 minutes. That makes it ideal for providing a baseload bridge to permanent power installations, or for generating backup power to support natural disaster relief, plant shutdowns, or equipment maintenance.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144