GE’S MODULAR SOLUTION:

GE understands that the power

and energy needs of customers are vastly different. Our energy

storage solutions can be tailored to your operational needs:

enabling efficient and cost-effective storage, distribution and

utilization of energy where it’s needed and when it’s needed.

Built with GE’s superior design and technology, our energy

storage technology delivers high performance in the most

demanding applications.

Battery Energy Storage

Solutions (BESS)

CASE STUDIES

The Imperial Irrigation

District’s (IID) 30 MW/

20 MWh Battery Energy

Storage System (BESS)

began commercial operational in October of

2016. The BESS was immediately impactful

in the operation of the IID grid by reducing

the Balancing Area Contol Error Limits (BAAL)

excursions by 83% and eliminating BAAL

excursions greater than 20 MW compared to

the three months before and after operation

began.

The IID BESS provides 60 MW of

bi-directional fast flexible regulation and 30

MW of spinning reserve capability

enabling

IID operators to shut down gas fired generation

operating at minimum power. This enables an

optimized system dispatch which increases

overall system efficiency. Additional essential

grid services provided by the GE supplied BESS

are solar following, Automatic Generation

Control (AGC), Area Control Error (ACE) control

mode, frequency response and black start

functionality.

The IID BESS black start

functionality is a first for North America

and provides IID critical system restoration

capability. This functionality included

electrifying part of the IID 92KV grid and back

feeding the generator step-up providing all the

auxiliary power loads required to start the 44

MW gas turbine. The gas turbine was started and

synchronized to the BESS. The BESS immediately

became a dynamic system load enabling the

gas turbine to maintain its correct voltage and

frequency as additional load was added.

Hybrid Facility at GE’s Power Electronics Factory in Berlin

. In reaction to

Germany’s energy transition roadmap, GE initiated a smart and fully integrated

hybrid power plant consisting of a reciprocating engine, solar PV, battery

storage, and a control system on the site of GE’s Power Electronics factory in

Berlin. The rating of the system is designed to best fit the economic benefits of the site. While still

maintaining grid code compliance at all times, this hybrid solution led to a reduction in operating

costs of the local factory and all of the power electronics for the system were manufactured on site.

BUILDING BLOCKS

more energy

†††

S U B S T A T I O N

more power

high power configuration

for ancillary services

longer duration

configurations for

peak management

and energy shifting

22  / 

HYBRID SOLUTIONS

 / 

www.gepower.com/hybrid www.gepower.com/hybrid

/ 

HYBRID SOLUTIONS

 /  23

so l ut i ons

so l ut i ons