Table of Contents Table of Contents
Previous Page  32-33 / 52 Next Page
Information
Show Menu
Previous Page 32-33 / 52 Next Page
Page Background

Typical configuration of

a 2x6F.01 plus battery

conceptual design

D E S C R I P T I O N

Coupling battery storage with

a GE combined cycle power

plant offers users the benefits

of the latest advances in storage

technology, while maintaining

the reliability expected from a

manufacturer with more than 60

years of gas turbine experience.

GE’s hybrid battery storage

solution can be added to existing

combined cycle plants, integrated

with new combined cycle plant

installations during construction,

or even included as a complete

upgrade package to convert

from simple cycle operation

to combined cycle + battery

storage. This modular approach

enables GE to deliver the right

solution to help maximize the

value of your installation.

B E N E F I T S

There are several opportunities

for a battery storage solution

to add value to a combined

cycle power plant:

• Faster combined cycle startup

• Simple cycle flexibility with

combined cycle efficiency

• Lower CAPEX than standalone

storage solutions

• Black start capability without

needing a backup diesel genset

• Enhanced grid frequency

regulation

• Additional peak capacity during

periods of high energy demand/

high pricing

Most customers will be able

to recognize multiple benefits,

further enhancing the value.

The advantage of our single-OEM

offering is that GE will work with

you to design a solution that

meets your specific needs, while

ensuring that all the components

work together seamlessly. With

our intimate knowledge of the

capabilities of the individual

products, we can optimize the

integration to provide the highest

performance while minimizing cost.

CCGT  BATTERY

Improving Combined Cycle

Flexibility and Utilization

with Battery Storage

C A S E S T U D Y

In a 2x6F.01 installation with a

55 MW/18 MWh battery, GE's

hybrid solution can provide

full combined cycle output

(162 MW) within 13 minutes

of engine start. A standard

2x6F.01 without battery

storage would take more

than twice as long to achieve

full combined cycle output.

In a Primary Frequency

Response application,

a 9F.03 CCGT with a

9 MW/2.5 MWh battery can

provide the same capabilities

as an appropriately sized

standalone battery solution…

at a 30% lower capital cost.

T H E R M A L S Y S T E M S

32  / 

HYBRID SOLUTIONS

 / 

www.gepower.com/hybrid www.gepower.com/hybrid

/ 

HYBRID SOLUTIONS

 /  33

so l ut i ons