UP G R A D E S O GENERATOR SERVICE AND UPGRADE SOLUTIONS
Flexibilization Package BE READY FOR CYCLING OPERATION
Generators built in the 90s were designed to be operated at base load. The industry shift to cycling operation has multiple implications for machine operation, like frequent starts/stops, peak operation, and turning gear operation, leading to additional stress and an increased risk for forced outages.
GE’s Flex Packs—including integrated stator and rotor upgrades—support your cycling operation needs, greatly reducing the risk of critical component failure.
Generator Closed - Visual
Outage Applicability Generator
Open Rotor In - Minor
Generator
Open Rotor Out - Major
✔
Technical Data
Lifetime Extension of Critical Components Configured for Base Load 5,000 Start-stop cycles with old copper† 10,000 Start-stop cycles with new copper†